Projects

110 Goulburn Street

An urgent make-safe project which included the replacement of combustible cladding.

When the building façade started to dislodge at 110 Goulburn Street, Paynter Dixon was called to do urgent make-safe work to protect residents and the public.

At the same time, Aluminium Composite Panels, which were no longer a compliant material, were removed.

They were replaced with Building Code of Australia-compliant panels.

All work was completed without disruption to the residents.